This project includes the design of brackish water well for agriculture use in the northern Golan Heights. The well was drilled to a depth of 1,500 meters. The depth to the water table was 700 meters, and accordingly a submersible pump was designed to be installed at a depth of 800 meters. The design included pipes, pumping equipment, electrical system, and civil engineering. In addition, the design included a 2.2 km long pipeline for connecting the well to the regional water supply system.