The plans of the Ashalim PLOT A solar power facility, included the design of three evaporation ponds performed by Ecolog. The purpose of these ponds is to collect the brine from the facility process and evaporate it. The design was carried out in accordance with the strict standards of the Ministry of Environmental Protection.