Following the construction of the gas pipeline, erosional features developed along some sections of the pipeline. Ecolog assessed the areas that need to be treated and designed the remediation needed for the damaged sections and the required protections to prevent future damages. At each section, the appropriate solution was adapted to the specific erosion mechanism at that location.

    Want to know the order of magnitude of such a project?
    Leave details and we will get back to you as soon as possible