This project includes detail design of steel pipes with a diameter of 40″ and a length of 6 km, for the “Mekorot” pipeline from the Be`er Sheva North station to the Shoket 2 well (near Omer). The purpose of the pipeline is to increase the water supply on the Beer Sheva-Shoket-Arad axis. The pipeline alignment is parallel to Road 60 and includes details of connections to wells and consumer connections, and seven horizontal drillings for road crossings. The route of the pipeline passes through the areas of two planning committees and was coordinated with numerous authorities and infrastructure agencies.